Sara Kulturhus - Skellefteå

The construction of the Sara Cultural Center with a hotel was a significant part of Skellefteå's development and central to the extensive urban transformation. The project included features such as stages, a library, art galleries, a restaurant, and hotel rooms. Audico Systems executed a turnkey contract for the AV (audiovisual) system, which encompassed design, project management, installation, commissioning, and programming of audio, lighting, and video equipment, infrastructure, and control systems for stage areas, rehearsal rooms, and a mobile AV system.

Introduction

The construction of the Sara Cultural Center with a hotel was a significant part of Skellefteå's development and central to the extensive urban transformation. The project included features such as stages, a library, art galleries, a restaurant, and hotel rooms.

The design of the building emerged from an architectural competition held in 2016, in which White Arkitekter emerged as the winners. The structure primarily incorporates a wooden frame, and the hotel portion stands 20 stories tall with a basement.

Solution

Audico Systems executed a turnkey contract for the AV (audiovisual) system, which encompassed design, project management, installation, commissioning, and programming of audio, lighting, and video equipment, infrastructure, and control systems for stage areas, rehearsal rooms, and a mobile AV system. The installation took place from Q4 2020 to Q4 2021 and carried an economic scope of 12.4 million SEK.

Product Specification

The project included elements such as the Müller BBM's VIVACE system. For the PA-system in the various stages, L'acoustics equipment and Yamaha mixers were installed. The lighting equipment consisted of lighting consoles from MA Lighting, fixtures from ETC and Chauvet, as well as infrastructure from Luminex. The video equipment included Panasonic cameras, Vivitek projectors, and image distribution from IDK (SDVoE).

Sara Kulturhus
Looking for something similar?
Contact us
Drew Black
Technical Manager
+46 8 522 05 734
drew.black@audico.se
Michael Nilsson
Senior Installation Technician
+46 8 522 05 735
michael.nilsson@audico.se

Our Solutions

REFERENCES

Here's some of our work. By clicking the buttons, you'll find our references sorted for different industries.
Show All
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Kone

Kone

KONE built a new showroom next to its Hyvinkää lift factory. It will showcase the company's products to prospective customers around the world. Audico carried out the AV part of the project.
Read More
Pro Nemus Showroom

Pro Nemus Showroom

Metsä Group wanted to create a new and spectacular showroom alongside their bio-product factory to showcase their product journey from the forest to the factory and ready-made products.  Audico was chosen to implement the impressive AV solution for their Pro Nemus-showroom.
Read More
Alexander Church

Alexander Church

During the pandemic, the Church of Alexander's members in Tampere realized they need a solution to make their services remotely available. For this, Audico created an easy streaming solution. Some unnoticeable technical equipment was also required to make it happen.
Read More
Hospital Nova

Hospital Nova

Hospital Nova in Central Finland represents a new kind of hospital architecture in Finland. Together with Lighting Design Collective, we were responsible for the exterior face of the hospital.
Read More
Tampere Hall

Tampere Hall

Tampere Hall is the most significant cultural facility and congress centre in Scandinavia. It is situated in the heart of Tampere, the third-largest city in Finland. Every year Tampere Hall hosts more than a thousand events, including concerts, children's cultural events, and meetings. We have been voted the best conference centre in Finland seven times in a row. 
Read More
Askersund Center of Knowledge

Askersund Center of Knowledge

Askersund Municipality had a vision to create a centre for knowledge and culture - a building that serves as a gathering place and catalyst for creativity, music, education and information in the municipality.
Read More
Borås Kongress

Borås Kongress

Adapted to everything from small meetings to large congresses, Borås Kongress has, in addition to a large congress hall, a banquet hall and an exhibition hall as well as 23 meeting rooms. The rooms can accommodate from 2 to 1,000 people. Audico has carried out a complete installation of AV technology in the large congress hall and the other larger halls.
Read More
Coop Norrbotten Arena

Coop Norrbotten Arena

Audico (time. Bright Installation AB) carried out an extensive installation in Coop Norrbotten Arena with the aim of creating a live experience beyond the ordinary.
Read More
Audico Icon 3D
LET'S TALK.

Our team of professionals is eager to hear from you. Perhaps you have a question about your AV equipment? Do they need to be updated? Or is it a problem at the office in that one meeting room that everyone keeps avoiding? Or something else entirely? Drop us a message, and we’ll promise to help.
We are here for you.

Contact us